top of page
Construction Team Meeting
Construction Team Meeting

Featured Projects

9da5b6_fd18d4c5fd434529b05ec34c6d973950~mv2.jpg

Kapyong Property Development – Block A Infrastructure and Gas Bar Civil Works

ODK Engineering supported the construction of infrastructure within Block A of the Kapyong Property Development, including roadworks, wastewater systems, water infrastructure, and civil works for the gas bar.
 

Services included resident and non-resident contract administration, along with project closeout support through as-built drawings, operation and maintenance manuals, and final reporting.

​​

Kapyong Property Development, Block A, Winnipeg, Manitoba

dji_fly_20250704_183514_367_1751672123479_photo_optimized.jpg

Ebb and Flow First Nation Fire Hall

ODK Engineering provided Project Management and Engineering services to coordinate the overall delivery of a New Fire Hall 
Building. The scope of the project consisted of planning, design, and 
construction

​

Ebb and Flow First Nation, Manitoba

2643-9344_edited.jpg

Pine Creek First Nation - Dauphin Gas Bar

ODK Engineering provides project management and civil 
engineering services to design and construct a new gas bar business. The civil engineering services consisted of the land drainage system, roadway design, sewer, and water design. ODK coordinated the engagement of a petroleum consultant to provide design and construction administration services, fuel storage, pumping station, and environmental protection measures.

​

Dauphin, Manitoba

9da5b6_4bdd3942a17543be927e004e18bf06d8~mv2.jpeg

Sapotaweyak Cree Nation Hotel and Conference Centre

ODK Developments partnered with Sapotaweyak Creen Nation to plan, secure funding, and provided project management services for the construction of a 38,811 square foot hotel. The project aims to provide high-quality, modern hospitality facilities for local development. 

​

Swan Lake, Manitoba

2020-02-05~GroundBreaking (7).jpg

Sapotaweyak Cree Nation Water Treatment Plan

ODK Engineering provided engineering services for the planning, designing and construction of a Water Treatment Plant . The project included reviewing population projections and updating the community development plan before moving forward with detailed design, as well as testing the proposed treatment technology. The existing reservoir and water treatment plant were inspected and cleaned to assess their condition and determine whether they could be repurposed, while a suitable site was confirmed for the new water treatment plant.

 

The work included the design and construction of a new membrane-based water treatment plant and an 855 m³ treated water reservoir, along with decommissioning or repurposing of the existing plant and ongoing monitoring of water quality. The project also included designing and constructing a new raw water intake in Dawson Bay, supported by bathymetric surveys, historical aerial photo reviews, flood-level assessments, and water quality testing to determine the appropriate treatment requirements.

​

Sapotaweyak Cree Nation, Manitoba

IMG_2345.JPG

Brokenhead River Bridge Replacement  

ODK provided survey services for the Brokenhead River Bridge Replacement Project. ODK created a digital terrain model within a 50-metre radius of the existing bridge and surveyed the abutment pile caps, girders, piers, deck, wing walls, and abutments to capture accurate measurements and dimensions. ODK also established temporary benchmarks at the abutment corners. ODK provided a proposed survey plan, along with the raw and processed survey data for further use.

​

St. Clements, MB

All Right Reserved

bottom of page